Phase 4 of Sand Hollow Village Subdivision. 54 lot paper subdivision close to Sand Hollow in Hurricane Utah. The preliminary plat has been approved. The property will be part of parcel H-4-2-11-322 and H-4-2-11-321. The property will be based on engineers drawing and legal description. This subdivision is 4 phases. Preliminary plat for all 4 phases has been approved. Construction Drawings for phases 1-3 have been approved. The additional phases can be bought together or independent. Phase 4 will need to be sold with or after phases 1 and 2.